Opens in a new tab

Support SPC

Successfully Implement the SPC in Your Workshop.
Schedule an SPC assessment

Why do so many SPC projects run out of steam?

Statistical process control is a proven method. However, many manufacturing facilities have had SPC software that eventually ended up being used only for audits. The reasons are almost always the same:

  • A Theoretical Configuration : Sampling frequencies and sample sizes determined by the office, without taking into account the actual pace of the job.
  • Alerts That Are Too Chatty : By constantly pointing out minor discrepancies, people no longer react to the real abuses.
  • A company-wide rollout : too many references and features all at once, and a project that’s getting bogged down.
  • No contact person identified : Without a project manager, a workshop coordinator, and an IT coordinator, decisions drag on.
  • No review routine : The control charts are being filled out, but no one is analyzing them.

Our coaching method addresses each of these points, step by step.

The Steps for Implementing the SPC

Assessment
Starting from Reality
(1 day)
Before implementing SPC (Statistical Process Control) software, it is essential to understand the production process as a whole.
Objectives

Assess the feasibility of implementing SPC software. We track each part from raw material to shipment, working with quality control, metrology, and inspectors: checks performed, measurement tools used, and what has already been traced versus what has not. We then compare your current workflow to the target workflow in Ellistat to determine what will be included in the pilot and what will remain outside the scope for now.

Before leaving the site, the project team is assembled and the pilot reference point is selected: one that is representative of production, frequently measured, and connected to an existing measurement system. The action plan is dated, assigned, and approved with you on-site—not sent to you in a report two weeks later.

Deliverables
  • Diagnostic Report (Discrepancies, Recommendations)
  • Dated and signed action plan
  • Pilot reference identified
  • Gantt Chart for the SPC Project
Creation
of standards
Configure
(2 to 5 days) 
Objectives

Your key users and the project team are trained on the software by directly developing their own standards: 

  • website creation,
  • control ranges,
  • custom fields,
  • configuring contexts and alerts,
  • connecting measuring instruments,
  • creation of dashboards
  • …

As an optional feature (based on a quote), your historical data can be automatically imported into Ellistat (see below).

Deliverables
  • SPC software configured for the pilot part number
  • Independent software project team
Data transfer
Optional
(based on a quote)
Databases from legacy SPC software, Excel files, CSV exports… No matter what format your existing data is in, our teams will automate its transfer to Ellistat. You’ll have access to your historical data from day one and can start using the solution immediately, without having to re-enter any data.
Objectives
  • Make the Ellistat SPC software operational right from the start
  • Avoid manual re-entry and the associated errors
Deliverables
  • Historical data imported and verified in Ellistat
  • Product lines and features associated with the correct part numbers
Training
of users
Optional
(1 or 2 days)
To help operators and inspectors understand what they are measuring, two on-site training sessions are offered:
SPC Basic Training - 1 day
  • Understand the concept of capability.
  • Understand the importance of Statistical Process Control.
  • Know how to apply the rules of a control chart to any type of process.
Advanced SPC Training - 2 days
  • Master the basics of descriptive statistics.
  • Master the concept of capability.
  • Understand the importance of Statistical Process Control.
  • Know how to set up a control chart on any type of process.
  • Validate a control process
RETEX and
rollout
Transform the pilot
into routines
(1 day)
After a few weeks of use, we're heading back out into the field to see what's actually being used on a daily basis, what isn't, and why.
Objectives
  • Adjust the Ellistat SPC settings to reflect actual field conditions (sampling frequencies, sample sizes, alert thresholds that are too sensitive, etc.).
  • Technical questions & answers
  • Use capability indicators under real-world conditions.
  • Adapt sampling frequency and size.
  • Set up field routines
Deliverables
  • Application tailored to the site's specific characteristics
  • Field procedures in place
  • Deployment Expansion Plan
Schedule an SPC Assessment

Our Experts

Davy Pillet
Davy Pillet
CEO
Expert in statistics and industrial process optimization.
Abdelilah Khibi
Abdelilah Khibi
SPC/IQC Expert
Expert in applied statistics and industrial process optimization.
Ismail Taleb
Ismail Taleb
PhD Industrial Engineering
Expert in applied statistics and production management.
Machine tools machining a revolutionary part with automated process control

I would like to be contacted for an SPC diagnosis

One day on-site is all it takes to figure out what needs to be addressed in the SPC, where to start, and what the timeline should be. You’ll leave with a dated action plan, whether or not you choose to continue working with us.